Placeholder Image

字幕表 動画を再生する

  • three is the LCU on countdown net.

  • We're about five minutes from our first available clock.

  • Pause points at T minus 10 minutes and 30 seconds.

  • All teams check your status and report back of additional time is required.

  • Mission Manager Elsie on countdown go Confirm Spacecraft is on internal power.

  • Confirmed two states we'll see.

  • And Vic and E nine BTV heaters up, prepares for engine show Stage two Looks throwing back preparation for healing loop.

  • Good throttle.

  • Back on stage, she looks good.

  • Throttle up stage unlocks checking number.

  • Close up.

  • Great cinematic secure respect has it's disabled flights offer set up's complete initializing spent T tip and hydraulic final set ups.

  • A ground suffered final setups.

  • A complete stage wound.

  • Crabbing Williams and topping in the hydraulics.

  • Tracking in Problem for America for engine till 30 seconds.

  • Property for engine chill stage.

  • Wanna Hannah Cushion Scared it backs chilling in head and went These Children psychedelics at full pressure stage to Ukraine.

  • Williams and Topping and Wendy's reasserting to TV.

  • See no position and back to be set up's complete stage one.

  • Everyone scared for flight vehicles and self alone Stage one.

  • Stage two.

  • Your heaters closing out.

  • That's a myth.

  • Garcia, this is ours.

  • Young countdown one with a contract.

  • How's your Latin?

  • Clear?

  • What was that line?

  • Clear.

  • Clear.

  • Our city has all parties line clear.

  • Maybe the range ops.

  • Stage one.

  • Stage two.

  • You press for strong like retract stage one.

  • Helium level secured.

  • Stage two.

  • High fluid to be purchasing.

  • Preparation for Lux.

  • Close up.

  • Strong back motion activity.

  • Emotions complete.

  • Idol X cured F T s.

  • His own internal power.

  • FDs is armed.

  • I'll see copies.

  • F t s is ready for logo.

  • Believe in education.

  • Stage one lakh secured for flight in vac.

  • Ignited purchase complete.

  • Eventually complete.

  • And in fact, the TV emotions strong, back retracted and locked out.

  • Staged to look secured for flight.

  • Look, tonight is on internal power.

  • A one D TC parent's plight.

  • Full pressure.

  • And when do you feel complete vehicles and self alone?

  • Stage one states.

  • You crack helium and they see a secure flight stateside by says secured.

  • BC Confirm if night and start up Falcon nine's and start up stage one.

  • Stage two person for flight T minus 30 seconds.

  • Ground.

  • Your clothes are complete.

  • T minus 20 seconds.

  • Falcon nine's configured for Flight 15 T minus.

  • Ted going Hey, seven, six, five, four, three, two, one.

  • Lift off work.

  • Yeah.

  • No, Them back chill has begun.

  • Power to trample.

  • Beaches are good.

  • This is the one of them.

  • Separation.

  • Cooper Recovery has a OS staring.

  • Separation confirmed.

  • Stage to propulsion.

  • Still double avionics.

  • Healthy age too.

  • Stage to propulsion.

  • Still nominal.

  • Beach to power to on the tree or healthy stage one entry started.

  • Made one entry burn.

  • Stage one entry shut down.

  • Stage to propulsion.

  • Stole.

  • Nominal.

  • For me it Acquisition of signal stage was trance on it.

  • Stage one.

  • Plan to start up stage one.

  • Let it burn.

  • Nominal parking orbit insertion.

  • Loss of signal.

  • This is recovery.

  • Falcon nine has landed.

  • All ending operators.

  • Procedure Procedure $11.100.

  • Section eight on recovering it Cape.

  • Loss of signal expected purview.

  • The loss of signal Expected acquisition of Signal Capone.

  • Power into it.

  • Good.

  • Nominal GTO insertion acquisition of signal Age.

three is the LCU on countdown net.

字幕と単語

ワンタップで英和辞典検索 単語をクリックすると、意味が表示されます

B2 中上級

JCSAT-16 テクニカルウェブキャスト (JCSAT-16 Technical Webcast)

  • 3 0
    林宜悉 に公開 2021 年 01 月 14 日
動画の中の単語