Placeholder Image

字幕表 動画を再生する

  • stage to RP one loaded, closed out blocks load Stage two.

  • Auto started Stage one and Stage two lakhs.

  • Full rates are nominal.

  • T tub and Helima spin Final set ups has started.

  • T Tub is configured for flight.

  • Helium spend is configured for flight engine Jill started Stage one r p one topping for flight stage one r p one is closed after foot vehicles and self one vehicle tanks are pressing for strong back Retract stage two Little movement has started.

  • Launch mount A strong back on time has started.

  • Good launch mount A strong back on pin Good stage to cradle in pin Starbuck retract it started.

  • Starbuck retract is complete holding at 88.5.

  • Stage one lots of clothes, every flight stage too long to close After flight Casca listen Started vehicles and started.

  • Go for lunch Gas, close outs.

  • Complete stage one.

  • Tanks pressing for flight T minus 15 seconds and nine eight seven six five for three two one Ignition liftoff.

  • State on purpose.

  • Nominal vehicles pitching down range.

  • Parent telemetry nominal vehicle is supersonic.

  • Vehicle has reached maximum dynamic pressure and back engine, too.

  • Mico stage separation confirmed and recognition.

  • But a joint F T F for safety vehicles on a nominal trajectory.

  • But, like with the signal position in New Hampshire, vehicle remains on a nominal trajectory.

  • Stage two is in terminal guidance stage to a idiot.

  • Safet Mico, Nominal orbit insertion.

  • Acquisition of signal.

  • New villain.

  • Hey, little boy.

  • Confirmed.

  • Si, si.

  • On countdown during term separation, this is Dragon CC on Countdown Dragons.

  • Propulsion system has successfully primed at all.

  • Thrusters.

  • Report ready for firing.

  • Dragon is deploying its solar rays.

  • What's the signal?

  • In New Hampshire, Dragon solar rays had successfully toward Dragon.

  • Solar rays are ready for activation.

  • Expected loss of signal knew Philip.

stage to RP one loaded, closed out blocks load Stage two.

字幕と単語

ワンタップで英和辞典検索 単語をクリックすると、意味が表示されます

B2 中上級

CRS-15ミッション (CRS-15 Mission)

  • 2 0
    林宜悉 に公開 2021 年 01 月 14 日
動画の中の単語